Procore is one source system in AI training data licensing, and its export routes, its agreements and the copyright in the drawings inside a project decide what a construction company can offer.
The drawings in a project are often an architect's or an engineer's work, and Procore's agreements could not be read from the page text on November 18, 2026. One program, Mercor, names Procore on its construction listing.
DataPacts Editorial Team: how we source, date and check every figure. Procore help articles and the Procore legal index were read on November 18, 2026, and the statute text and the Mercor listing the same day.
What a Procore Project Holds and What a License Can Cover
A Procore project holds the working records of a build: RFIs, submittals, change orders, daily logs, inspections, drawings, specifications, photos and models, with the directory of the people and firms on it.
What buyers want from construction records and who owns what sit on the page for construction and trades companies licensing data to AI. This page covers the export mechanics only. Procore is one construction system, and ServiceTitan and Deltek have their own pages.
Who Controls Procore Project Data in a License
Three layers shape what a company can license from a Procore project: Procore's own agreements, the copyright in the drawings and specifications inside it, and the subcontractors, owners and workers whose data it holds.
Procore's Agreements: What Was and Was Not Readable
Procore's legal index, read on November 18, 2026, lists a User Terms of Service, API Terms and Conditions, Online Subscription Terms, Supplemental Terms, a Privacy Notice, a Data Processing Addendum, three subscription agreements and an Acceptable Use Policy, and the text of these documents loads through a script embed that the page source does not contain. The copyright line on the pages reads "© 2026 Procore Technologies, Inc."
No clause on ownership of customer data, on Procore's own use of it, on the export window after a contract ends or on artificial intelligence was read, so none is stated here.
The same page describes Procore as "grounded in 20 years of expertise and data from three million global projects", which is Procore's own marketing statement and says nothing on how that data is used.
A seller reads the signed subscription agreement, not this page, before a sample leaves the account, and a rights audit of the data to be licensed starts from that signed text.
Whose Drawings and Specifications Sit in the Project
Drawings and specifications in a Procore project were usually prepared by an architect or engineer, and under 17 U.S.C. 101 an architectural work is the design of a building as embodied in any tangible medium, including plans and drawings.
Section 102(a)(8) lists architectural works among the works of authorship, and section 102(b) excludes ideas, procedures, processes, systems and methods of operation from protection (Code edition of 2023, read November 18, 2026).
Under section 201(b), for a work made for hire the employer or other person for whom the work was prepared is considered the author unless the parties agree otherwise in a signed written instrument.
Section 120(a) says the copyright in a constructed architectural work does not include the right to prevent pictures of it when the building is located in or ordinarily visible from a public place, and section 120(b) lets a building owner alter or destroy the building without the author's consent.
Both concern the building, not the plans, so neither gives a basis for licensing drawings.
Owner-architect agreement terms, such as the AIA documents, are not described because their text was not read, and each company reads its own contracts. Staff-made records against client designs are covered on the industry page, and the ownership layers of CAD and engineering files on the design-file page. This section is information, not legal advice.
Subcontractor, Owner and Worker Data Inside Procore
The Project Archive also exports subcontracts, subcontractor invoices, the Directory of contacts, Incidents and Inspections, so an archive carries other firms' commercial terms and individuals' details beside the company's own records.
Subcontractor shop drawings and owner-furnished documents are not the contractor's by default, and owner contracts and confidentiality clauses come before any license term.
Workers and bystanders appear in photos and incident records, and Article 9(1) of the GDPR (Regulation (EU) 2016/679, applies from 2018-05-25) makes health data special-category data unless an Article 9(2) exception applies.
Whether a subcontract or an owner contract restricts the project data is a question for the contract itself, and the confidentiality clauses before licensing data are read on the consent page.
How Procore Project Records Leave the Account
Procore project records leave an account by four routes: the Project Archive tool, the Procore Extracts desktop application, Cloud Connector for analytics data, and the API. The table compares the four as read on November 18, 2026.
| Route | Who runs it | What the record shows | Source |
|---|---|---|---|
| Project Archive tool | A user with at least Read Only on the tools; archives are private to the creator and visible to Directory Admins | 26 listed project tools; ZIP; 30 days to retrieve; most items PDF, documents and photos in original type | support.procore.com Project Archive articles |
| Procore Extracts application | Admin users, on a Windows computer | Tool-by-tool extracts, attachment choice, drawings as All Revisions or Current Set | support.procore.com Procore Extracts articles |
| Cloud Connector (Analytics 2.0) | Customers on analytics | Replaces Data Extract; powered by Delta Share | support.procore.com FAQ |
| API | The company or an app | Limits and terms not read | developers.procore.com |
Project Archive
The project-level Project Archive tool creates an archive of selected tools, and the archive can be retrieved for 30 days as a ZIP file once its status is Completed or Partially Completed.
It works on active and inactive projects, needs at least one tool and one item per tool, and offers filters, grouping and column choices.
The FAQ lists 26 tools, among them RFIs, Submittals, Daily Log, Drawings, Photos, Directory, Subcontracts and Incidents. Most items arrive as PDFs, while documents and photos keep their original file type, and items without a grouping value land in an "Ungrouped" folder. Attachments cannot be excluded for Change Orders, Directory, Documents, Models, Photos and Specifications.
A seller keeps its own manifest of:
- the tools chosen and the filters applied;
- the attachment setting for each tool;
- the archive date and its status.
Procore Extracts
Procore Extracts is a desktop application for Windows computers that lets Admin users pull items from Procore projects in bulk, tool by tool, with a choice of whether to include attachments. The user needs Admin permission on the tools.
For Drawings the application offers All Revisions or the Current Set, and custom tools with an export function can be included. It retries a failed transfer three times, then pauses and resumes.
A "File Rename Information" CSV lists files renamed for Windows name limits such as 260-character paths. The release shown on the help center is 1.4.0, dated 10/13/2026.
Cloud Connector and the API
Customers using the older Data Extract must migrate to Analytics 2.0, which Procore now calls Cloud Connector and describes as powered by Delta Share.
The developers site lists an API Terms of Use and a Terms of Service, but the API text and its limits were not read, so no limit is stated. Programs that read data in place instead of taking an export are covered under buyer connectors versus native exports.
What a Procore Export Holds: Drawings, Photos, Daily Logs and People
A Procore export carries records in PDF and original file formats, and it carries personal data in fixed fields and in free text, so removal starts with the Directory and ends with photos and incident records. The fields to check are:
- Directory contacts and firms, with names, roles and contact details;
- daily log entries with weather, labor and notes, filtered by log status and type, with empty days excluded by default;
- RFI and submittal text with named reviewers;
- photos with people and vehicle plates;
- Incidents and Inspections with injured workers and findings.
The manifest lists what the archive left out, because filters, log status and attachment settings change what is in it. Method for the personal data sits on the page for PII removal and de-identification, and photos follow the face rules of the image page.
What Programs Name When They Ask for Procore Records
One program on record names Procore: Mercor lists it first among seven tools on its Construction Company listing, re-read November 18, 2026. The table gives the listing as of that date, and every value is Mercor's own statement.
| Program | Role | Procore named as | Terms that matter for Procore data | Source |
|---|---|---|---|---|
| Mercor Construction Company listing | Program (buyer or licensee program per the industry page legend) | First of seven tools: Procore, Autodesk Construction Cloud, Revit, AutoCAD, Bluebeam, Primavera P6, DroneDeploy | Requirements: completed-project records and site imagery, 50+ employees; not a fit: "Marketing photos only", "Small crews without project documentation"; scoping questions "Which system holds them?" and "Do any owner contracts restrict project data?"; range USD 115,000 to 1,000,000, "Depends on project count and imagery" | api.data.mercor.com listings, construction |
HUMXN and Handshake AI name construction or design records and other tools, but not Procore (checked November 9, 2026). "Not stated" is not "allowed", so a program that omits Procore from its text says nothing about whether Procore records are acceptable.
No public figure exists on the DataPacts record for any sale of Procore-held records. The other programs and their terms are set out under payouts and program terms compared.
Licensing Procore Project Records: Benefits, Risks, Downsides and Alternatives
Licensing Procore project records is a choice with benefits and risks, and not licensing is an equally valid result.
Benefits
- Closed-out records otherwise left in a platform become a described dataset.
- A bulk export gives the company a copy it controls.
Risks
- Drawings can belong to an architect or an engineer, and a constructed building's picture rights do not extend to the plans.
- Subcontractor, owner and worker data travel inside the archive, including special-category data under Article 9(1) GDPR.
- Owner-contract clauses can restrict project data.
- A buyer can suffer a security incident: Mercor reported unauthorized access through compromised LiteLLM versions on 2026-03-24 and 2026-03-30 to the California Attorney General, and In re Mercor.io Corporation Data Breach Litigation, N.D. Cal., Lead Case No. 3:26-cv-02821-WHO, is stayed pending mediation by order of 2026-07-21 (Dkt. 44), with no ruling on the merits as of November 17, 2026.
Downsides
- The archive stays available for only 30 days.
- Preparation takes effort: the manifest and the removal of personal data come first.
- Attachments cannot be excluded for some tools.
Alternatives
- Do not license, and keep the records in Procore.
- License only staff-made records such as daily logs.
- Compare the other routes under alternatives to selling data, including not selling at all.
Procore Among the Industry Systems and the Seller Steps
Procore is one of the industry systems whose agreements and export limits decide what a company can license, next to ServiceTitan, Deltek and the other sector systems. The hub with all of them is export rights and mechanics by source system.
Field-service records are on the page for ServiceTitan, Housecall Pro and Jobber exports, design and project-management tools on Deltek, Autodesk and Newforma terms, and architects as the authors of their own drawings under engineering and architecture firms licensing data. The seller steps that follow an export are:
- Build the data inventory.
- Give employee notice and consent where staff data is inside.
- Write the data manifest.
- Plan delivering licensed data to an AI buyer.
- Decide should you sell or license your data at all.
Buyer Programs Cited on This Page
This page cites one program, Mercor.
Frequently Asked Questions
How do I export all project data from Procore?
The project-level Project Archive tool exports selected tools for a project, with Admin or Read Only rights on those tools, and the ZIP stays available for 30 days. Procore Extracts is the Windows application for bulk extracts by Admin users.
Does the Procore archive include every drawing revision?
The Procore Extracts application can include All Revisions or the Current Set of drawings, while the archive FAQ states no such option for Drawings.
Who owns the drawings stored in a Procore project?
Procore's pages do not say, and drawings prepared by an architect can be an architectural work under 17 U.S.C. 101 and 102(a)(8).
Under 17 U.S.C. 201(b) only a work made for hire belongs to the employer or commissioning party, subject to a signed instrument, as what company data cannot be licensed explains.
Can a construction company license its Procore records to AI companies?
Only records it controls can be licensed. Mercor names Procore on its listing, and drawings, owner contracts and people come first.